Perth Metro
FIRST LOAD
Earliest concrete, without ringing every yard.
Sun, 22 Nov · 11:30 pm AWST

The pour
Set the job. The board ranks who can be on site first.
Saved jobs
Sign in to save your regular pours.
N25 is the usual pick for driveways, house slabs.
Strength
Slump
Placement
When
Independent estimate, not a yard quote and not a booking. First Load is not affiliated with the suppliers listed. Times use plant locations and a typical book. Prices sit on published Perth 2025–26 ranges. Ring the first yard, and only keep going if they can't take it.
Call in this order
14 m³ N25 · Morley
Chute · 80 mm slump
Holcim ties the earliest slot, and they're the cheapest. On site Tomorrow 7:00 am.
CALL FIRST
Earliest estimateTomorrow
7:00 am
$3,695
estimate, inc GST · $264/m³
Holcim
East Perth plant · 10 km · 20 min · 2 trucks
6am3:30pmLight book at East Perth — first truck leaves near opening. 10 km, about 20 min on the truck. 2 trucks, 15 min apart. Last one about 7:15 am.
Metro plants from Wanneroo to Rockingham. Ask dispatch about ECOPact if you want a lower-carbon mix.
THEN 2
EstimateTomorrow
7:00 am
$3,581
estimate, inc GST · $256/m³
BGC Concrete
Bassendean plant · 6 km · 20 min · 2 trucks
6am3:30pmLight book at Bassendean — first truck leaves near opening. 6 km, about 20 min on the truck. 2 trucks, 15 min apart. Last one about 7:15 am.
WA-owned, the biggest metro fleet. Eight plants from Quinns Rocks to Mandurah, pumps included.
THEN 3
EstimateTomorrow
8:10 am
$3,633
estimate, inc GST · $260/m³
Hanson
Burswood plant · 11 km · 20 min · 2 trucks
6am3:30pmBurswood is sold until 7:50 am. 11 km, about 20 min on the truck. 2 trucks, 15 min apart. Last one about 8:25 am.
Inner-east yards at East Perth, Rivervale and Burswood. Strong when the pour is close to the river.
Supply figures are ex-GST mids of published Perth ranges, then GST is added. Cartage grows with road distance. A pump is a typical hire, not a quoted day rate. Saturday running is assumed only at some plants — confirm it.
50+
Yards tracked
Real-time
Updated
100%
Independent
4.9/5
Tradie rated
The launch
Watch the launch
Earliest concrete, without ringing every yard. See how the board ranks who can be on site first.
firstloadapp.comOn your phone
First Load,
in your ute.
Get the call order before the yards open. Push alerts when a slot frees up, saved presets for every regular job, and offline order briefs.